Saturday, 04 May 2024
 
 
Facebook Image
Facebook Image

TT-Magazine Newsletter

To receive email notification of media releases, click the "Subscribe" button and please fill in the form below.


Name:

Email:

Tratos produce 18km continuous length of subsea fibre Print E-mail

adriatic_lng_terminal.jpgTRATOS recently supplied a 24 Optical Fibres cable suitable for subsea installation up to 200 meters in depth for the ADRIATIC LNG Terminal which required a continuous length of 18km.

The Adriatic LNG terminal is a liquid natural gas offshore terminal nine miles offshore near Rovigo, Italy in the northern Adriatic. It is the world's first offshore LNG terminal. When the terminal becomes fully operational, it is expected to store and regasify 21.8 million cubic meters (770 million cubic feet) per day, enough to meet 10% of Italy’s natural gas needs.
The continual 18km length of Fibre in the TRATOS Cavi factory in Pieve S. Stefano (Italy).
The Adriatic LNG terminal on its way from Algeciras, Spain to it final destination near Rovigo, Italy in the northern Adriatic.